{"id":314309,"date":"2017-09-05T20:35:04","date_gmt":"2017-09-05T20:35:04","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18229"},"modified":"2017-09-05T20:35:04","modified_gmt":"2017-09-05T20:35:04","slug":"details-on-new-commercial-rapid-shutdown-solution-coming-from-sma-tigo","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/details-on-new-commercial-rapid-shutdown-solution-coming-from-sma-tigo\/","title":{"rendered":"Details on new commercial rapid shutdown solution coming from SMA, Tigo"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SMA and Tigo have announced a new rapid shutdown solution for the commercial market, which will be available in the second half of 2018. &ldquo;Since we introduced the Power+ Solution, we have received feedback from installers who are looking for a more cost-optimized way to achieve rapid shutdown in commercial<a href=\"http:\/\/solarbuildermag.com\/news\/details-on-new-commercial-rapid-shutdown-solution-coming-from-sma-tigo\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,14624,13436,13445],"class_list":["post-314309","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-rapid-shutdown","tag-sma-america","tag-tigo-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/314309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=314309"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/314309\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=314309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=314309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=314309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}