{"id":317125,"date":"2017-09-14T17:18:26","date_gmt":"2017-09-14T17:18:26","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18352"},"modified":"2017-09-14T17:18:26","modified_gmt":"2017-09-14T17:18:26","slug":"a-6-9-mw-community-solar-project-completed-on-massachusetts-farm","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/a-6-9-mw-community-solar-project-completed-on-massachusetts-farm\/","title":{"rendered":"A 6.9-MW community solar project completed on Massachusetts farm"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ameresco, Blue Cross Blue Shield of Massachusetts and BlueWave Solar just launched five community solar projects with a ribbon cutting ceremony at Twin Elm Farm in Mendon, MA. The solar arrays located in Hopedale and Mendon, three of which are located at Twin Elm Farm, comprise a total of approximately<a href=\"http:\/\/solarbuildermag.com\/news\/community-solar-project-completed-on-massachusetts-farm\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1282,14636,2906,9974],"class_list":["post-317125","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ameresco","tag-bluewave-solar","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/317125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=317125"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/317125\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=317125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=317125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=317125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}