{"id":318547,"date":"2017-09-18T20:27:57","date_gmt":"2017-09-18T20:27:57","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18384"},"modified":"2017-09-18T20:27:57","modified_gmt":"2017-09-18T20:27:57","slug":"photos-of-sollega-mounted-solar-install-that-survived-hurricane-irma","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/photos-of-sollega-mounted-solar-install-that-survived-hurricane-irma\/","title":{"rendered":"Photos of Sollega-mounted solar install that survived Hurricane Irma"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>At Solar Power International, we chatted with Elie Rothschild, sales manager at Sollega, a leading commercial solar racking manufacture. He mentioned that Sollega&rsquo;s injection molded FastRack 510 withstood 190 mph sustained (Category 5) winds of Hurricane Irma. Nearly 90 percent of the 900 kW array on the Westin Hotel are<a href=\"http:\/\/solarbuildermag.com\/news\/photos-of-sollega-mounted-solar-install-that-survived-hurricane-irma\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12637,2906,9974,14020],"class_list":["post-318547","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mounting-guide","tag-news","tag-projects","tag-sollega"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/318547","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=318547"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/318547\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=318547"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=318547"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=318547"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}