{"id":319478,"date":"2017-09-21T14:41:46","date_gmt":"2017-09-21T14:41:46","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18419"},"modified":"2017-09-21T14:41:46","modified_gmt":"2017-09-21T14:41:46","slug":"solar-flexrack-selected-for-superfund-solar-site-in-vermont","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-flexrack-selected-for-superfund-solar-site-in-vermont\/","title":{"rendered":"Solar FlexRack selected for Superfund solar site in Vermont"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Elizabeth Mine Solar Project on the Superfund site in Strafford and Thetford, Vermont, selected Solar FlexRack&rsquo;s FlexRack Series B3P-X fixed tilt system to support the 7-MWdc PV&nbsp;plant. The project is being developed by Greenwood Energy, Brightfields Development and Wolfe Energy and installed by Conti Solar (the turnkey EPC contractor).<a href=\"http:\/\/solarbuildermag.com\/news\/solar-flexrack-selected-superfund-solar-site-vermont\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,13220],"class_list":["post-319478","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-solar-flexrack"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/319478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=319478"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/319478\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=319478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=319478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=319478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}