{"id":324160,"date":"2017-10-05T15:40:11","date_gmt":"2017-10-05T15:40:11","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18516"},"modified":"2017-10-05T15:40:11","modified_gmt":"2017-10-05T15:40:11","slug":"nrel-asks-whats-the-state-of-ev-infrastructure-in-the-u-s","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nrel-asks-whats-the-state-of-ev-infrastructure-in-the-u-s\/","title":{"rendered":"NREL asks: What\u2019s the state of EV infrastructure in the U.S.?"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A new study from the U.S. Department of Energy&rsquo;s National Renewable Energy Laboratory (NREL) quantifies how much charging infrastructure would be needed in the United States to support various market growth scenarios for plug-in electric vehicles (PEVs). Sales of PEVs&mdash;which include plug-in hybrid electric vehicles (PHEVs) and all-electric vehicles (EVs)&mdash;have<a href=\"http:\/\/solarbuildermag.com\/news\/nrel-asks-whats-the-state-of-ev-infrastructure-in-the-u-s\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[862,14587,2906],"class_list":["post-324160","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ev-charging","tag-grid-modernization","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/324160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=324160"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/324160\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=324160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=324160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=324160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}