{"id":329974,"date":"2017-10-23T13:16:23","date_gmt":"2017-10-23T13:16:23","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18643"},"modified":"2017-10-23T13:16:23","modified_gmt":"2017-10-23T13:16:23","slug":"case-study-prepping-solar-tracker-systems-in-advance-of-a-hurricane","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/case-study-prepping-solar-tracker-systems-in-advance-of-a-hurricane\/","title":{"rendered":"Case study: Prepping solar tracker systems in advance of a hurricane"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>When the U.S. government declared a state of emergency in advance of Hurricane Irma&rsquo;s arrival on Sept. 8, we knew what was at stake for the 33 NEXTracker solar projects (or 24,000 tracker rows) that would be affected by the impending high winds and flood waters. Although our experience with<a href=\"http:\/\/solarbuildermag.com\/news\/case-study-prepping-solar-tracker-systems-in-advance-of-a-hurricane\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12637,2906,13010,13050],"class_list":["post-329974","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mounting-guide","tag-news","tag-nextracker","tag-solar-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/329974","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=329974"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/329974\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=329974"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=329974"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=329974"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}