{"id":330289,"date":"2017-10-24T12:10:06","date_gmt":"2017-10-24T12:10:06","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18066"},"modified":"2017-10-24T12:10:06","modified_gmt":"2017-10-24T12:10:06","slug":"solving-ci-solar-how-boutique-financing-is-growing-this-underserved-solar-segment","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solving-ci-solar-how-boutique-financing-is-growing-this-underserved-solar-segment\/","title":{"rendered":"Solving C&amp;I Solar: How boutique financing is growing this underserved solar segment"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Boutique financiers armed with massive databases and complex algorithms are changing the way that small commercial and industrial (C&amp;I) solar projects get financed. Typically targeting projects under 250 kW, these financiers have automated and accelerated as much of the underwriting chore as possible. The result is that old back-office costs<a href=\"http:\/\/solarbuildermag.com\/financing\/commercial-solar-financing\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14686,13988,4737,1590,14660,14687],"class_list":["post-330289","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-braggawatt","tag-ci","tag-featured","tag-financing","tag-september-october-2017-print-issue","tag-solrates"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/330289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=330289"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/330289\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=330289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=330289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=330289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}