{"id":330627,"date":"2017-10-25T12:50:50","date_gmt":"2017-10-25T12:50:50","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18668"},"modified":"2017-10-25T12:50:50","modified_gmt":"2017-10-25T12:50:50","slug":"sunlink-beefs-up-operations-team-with-two-executive-hires","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunlink-beefs-up-operations-team-with-two-executive-hires\/","title":{"rendered":"SunLink beefs up operations team with two executive hires"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunLink Corp. continues to expand its mounting systems, services and software to become a full-scope solar energy solutions provider. Its two new&nbsp;operations executive appointments keep the evolution rolling: Grumeet Grewal,&nbsp;VP of Supply Chain and Logistics, and Becky Sutro, VP of Strategic Sourcing and Supplier Quality. Grewal joins SunLink most recently<a href=\"http:\/\/solarbuildermag.com\/news\/sunlink-beefs-up-operations-team-with-two-executive-hires\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,12983],"class_list":["post-330627","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-sunlink"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/330627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=330627"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/330627\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=330627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=330627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=330627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}