{"id":331022,"date":"2017-10-26T18:57:30","date_gmt":"2017-10-26T18:57:30","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18687"},"modified":"2017-10-26T18:57:30","modified_gmt":"2017-10-26T18:57:30","slug":"new-jersey-water-treatment-plant-now-prepped-with-on-site-solar-plus-storage-microgrid","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/new-jersey-water-treatment-plant-now-prepped-with-on-site-solar-plus-storage-microgrid\/","title":{"rendered":"New Jersey water treatment plant now prepped with on-site solar-plus-storage microgrid"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A 250-kW, 1 MWh Eos Aurora DC battery system&nbsp;was&nbsp;commissioned at the wastewater treatment plant in the Borough of Caldwell, NJ. The batteries are a central component of Public Service Electric and Gas Company&rsquo;s (PSE&amp;G&rsquo;s) on-site solar-plus-storage microgrid that will help keep the facility operating during extended power outages. The Caldwell<a href=\"http:\/\/solarbuildermag.com\/news\/new-jersey-water-treatment-plant-now-prepped-with-on-site-solar-plus-storage-microgrid\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,13638,697,2906,9974,13648],"class_list":["post-331022","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-eos-energy-storage-llc","tag-microgrid","tag-news","tag-projects","tag-solarstorage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/331022","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=331022"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/331022\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=331022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=331022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=331022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}