{"id":332250,"date":"2017-10-30T14:07:06","date_gmt":"2017-10-30T14:07:06","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18701"},"modified":"2017-10-30T14:07:06","modified_gmt":"2017-10-30T14:07:06","slug":"details-on-new-multijunction-solar-cell-developed-by-nrel-thats-ready-for-commercialization","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/details-on-new-multijunction-solar-cell-developed-by-nrel-thats-ready-for-commercialization\/","title":{"rendered":"Details on new multijunction solar cell developed by NREL that\u2019s ready for commercialization"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The National Renewable Energy Laboratory (NREL) has entered into a license agreement with MicroLink Devices, Inc. (Niles, IL) to commercialize NREL&rsquo;s patented inverted metamorphic (IMM) multijunction solar cells. While high-efficiency multijunction solar cells are commonly used for space satellites, researchers have continued to look for ways to improve cost and<a href=\"http:\/\/solarbuildermag.com\/news\/multijunction-solar-cell-developed-by-nrel\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,5040,5863],"class_list":["post-332250","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-nrel","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/332250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=332250"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/332250\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=332250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=332250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=332250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}