{"id":33278,"date":"2014-08-28T13:22:44","date_gmt":"2014-08-28T13:22:44","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7906"},"modified":"2014-08-28T13:22:44","modified_gmt":"2014-08-28T13:22:44","slug":"region-solar-completes-150-kw-solar-project-for-florida-gardening-business","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/region-solar-completes-150-kw-solar-project-for-florida-gardening-business\/","title":{"rendered":"Region Solar Completes 150-kW Solar Project for Florida Gardening Business"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Region Solar has just completed a 150.3-kW rooftop and carport solar photovoltaic installation at SimGar, The Simple Garden, in Bradenton, Florida.&nbsp; SimGar&rsquo;s rooftop is outfitted with 297 panels, and the carport system is constructed of 204 solar panels.&nbsp; Not only does SimGar offer that highly-coveted shaded parking so sought after<a href=\"http:\/\/solarbuildermag.com\/news\/region-solar-completes-150-kw-solar-project-florida-gardening-business\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12492,2906,12497,4491,9751],"class_list":["post-33278","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carportcanopy","tag-news","tag-project","tag-roof","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/33278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=33278"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/33278\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=33278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=33278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=33278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}