{"id":334658,"date":"2017-11-06T18:47:07","date_gmt":"2017-11-06T18:47:07","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=18824"},"modified":"2017-11-06T18:47:07","modified_gmt":"2017-11-06T18:47:07","slug":"all-fronius-primo-symo-inverters-are-now-rule-21-compliant","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/all-fronius-primo-symo-inverters-are-now-rule-21-compliant\/","title":{"rendered":"All Fronius Primo, Symo inverters are now Rule 21 compliant"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Fronius USA received UL certification for the Fronius Primo 10-15 kW and Fronius Symo 208-V inverters to comply with California&rsquo;s Rule 21 inverter requirements. With that, all Fronius Primo and Symo inverters are now Rule 21 compliant. What this means Rule 21 refers to the generator interconnection requirements of each<a href=\"http:\/\/solarbuildermag.com\/inverters\/all-fronius-primo-symo-inverters-are-now-rule-21-compliant\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13215,12491,2906,3000],"class_list":["post-334658","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-fronius-usa","tag-inverters","tag-news","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/334658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=334658"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/334658\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=334658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=334658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=334658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}