{"id":345278,"date":"2017-12-08T13:59:29","date_gmt":"2017-12-08T13:59:29","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19107"},"modified":"2017-12-08T13:59:29","modified_gmt":"2017-12-08T13:59:29","slug":"check-out-this-1-6-mw-solar-install-for-californias-gilroy-unified-school-district","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/check-out-this-1-6-mw-solar-install-for-californias-gilroy-unified-school-district\/","title":{"rendered":"Check out this 1.6-MW solar install for California\u2019s Gilroy Unified School District"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>If you need a reminder of the booming solar + school trend, Gilroy Unified School District (GUSD), a K-12 school district with more than 11,300 students, just completed a 1.6&nbsp;MW&nbsp;PV system PPA expected to save $1.5 million in energy costs over 25 years. The three solar shade structure installations at<a href=\"http:\/\/solarbuildermag.com\/projects\/check-out-this-1-6-mw-solar-install-for-californias-gilroy-unified-school-district\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[990,13644,2906,13429,9974,14740],"class_list":["post-345278","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-borrego-solar-systems","tag-carports","tag-news","tag-ppa","tag-projects","tag-sunraise-investments"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/345278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=345278"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/345278\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=345278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=345278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=345278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}