{"id":346419,"date":"2017-12-11T14:17:39","date_gmt":"2017-12-11T14:17:39","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19119"},"modified":"2017-12-11T14:17:39","modified_gmt":"2017-12-11T14:17:39","slug":"fifth-largest-public-transit-system-in-the-country-signs-45-mw-power-purchase-agreement","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/fifth-largest-public-transit-system-in-the-country-signs-45-mw-power-purchase-agreement\/","title":{"rendered":"Fifth largest public transit system in the country signs 45-MW power purchase agreement"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Recurrent Energy LLC, a wholly-owned subsidiary of Canadian Solar, signed a 20-year power purchase agreement&nbsp; for 45 MWac of solar power with Bay Area Rapid Transit (BART), the fifth largest public transit network in the country and one of the largest consumers of electric power in Northern California. The BART<a href=\"http:\/\/solarbuildermag.com\/news\/fifth-largest-public-transit-system-in-the-country-signs-45-mw-power-purchase-agreement\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12961,1590,2906,9974,12963],"class_list":["post-346419","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-canadian-solar","tag-financing","tag-news","tag-projects","tag-recurrent-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/346419","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=346419"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/346419\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=346419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=346419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=346419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}