{"id":347522,"date":"2017-12-14T21:06:22","date_gmt":"2017-12-14T21:06:22","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19158"},"modified":"2017-12-14T21:06:22","modified_gmt":"2017-12-14T21:06:22","slug":"freedom-solar-installs-two-pv-systems-for-texas-candy-company","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/freedom-solar-installs-two-pv-systems-for-texas-candy-company\/","title":{"rendered":"Freedom Solar installs two PV systems for Texas candy company"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Those sour green apple candies at Alamo Candy Company are getting a lot greener. Freedom Solar Power recently designed and installed two new solar projects for Alamo Candy, one of the largest candy manufacturers, distributors, wholesalers, and retailers in San Antonio. Freedom Solar completed a 100.8-kilowatt solar array comprised of<a href=\"http:\/\/solarbuildermag.com\/news\/freedom-solar-installs-two-pv-systems-for-texas-candy-company\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974],"class_list":["post-347522","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/347522","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=347522"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/347522\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=347522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=347522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=347522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}