{"id":349674,"date":"2017-12-21T16:24:08","date_gmt":"2017-12-21T16:24:08","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19198"},"modified":"2017-12-21T16:24:08","modified_gmt":"2017-12-21T16:24:08","slug":"schneider-electric-sending-1000-conext-hybrid-inverters-to-puerto-rico","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/schneider-electric-sending-1000-conext-hybrid-inverters-to-puerto-rico\/","title":{"rendered":"Schneider Electric sending 1,000 Conext hybrid inverters to Puerto Rico"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Hurricane Maria swept through Puerto Rico over 90 days ago and many residents are still without power, making this the longest major blackout in U.S. history. Officials have estimated it could take four to six months to restore the power grid to full functionality. As we&rsquo;ve noted before, solar companies<a href=\"http:\/\/solarbuildermag.com\/news\/schneider-electric-sending-1000-conext-hybrid-inverters-to-puerto-rico\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,2906,2233],"class_list":["post-349674","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-news","tag-schneider-electric"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/349674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=349674"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/349674\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=349674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=349674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=349674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}