{"id":35019,"date":"2014-09-02T19:19:36","date_gmt":"2014-09-02T19:19:36","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7997"},"modified":"2014-09-02T19:19:36","modified_gmt":"2014-09-02T19:19:36","slug":"blue-oak-energy-installs-900-kw-rooftopcarport-solar-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/blue-oak-energy-installs-900-kw-rooftopcarport-solar-system\/","title":{"rendered":"Blue Oak Energy Installs 900-kW Rooftop\/Carport Solar System"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Fortinet, a&nbsp;provider of network security appliances, has flipped the switch on a 900-kW solar electric system which blankets its Santa Clara, Calif., corporate campus. Fortinet&rsquo;s commitment to sustainable business practices is now clearly exhibited with the installation of this commercial solar energy system which covers two rooftops and three parking<a href=\"http:\/\/solarbuildermag.com\/news\/blue-oak-energy-installs-900-kw-rooftopcarport-solar-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12492,12487,2906,9667,4491],"class_list":["post-35019","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carportcanopy","tag-modules","tag-news","tag-pacific","tag-roof"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/35019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=35019"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/35019\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=35019"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=35019"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=35019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}