{"id":366178,"date":"2018-02-08T16:00:11","date_gmt":"2018-02-08T16:00:11","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19397"},"modified":"2018-02-08T16:00:11","modified_gmt":"2018-02-08T16:00:11","slug":"rapid-shutdown-and-beyond-inside-nec-2017-and-the-effort-to-streamline-pv-design","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rapid-shutdown-and-beyond-inside-nec-2017-and-the-effort-to-streamline-pv-design\/","title":{"rendered":"Rapid Shutdown and Beyond: Inside NEC 2017 and the effort to streamline PV design"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>New codes and regulations are notorious for raising prices and halting innovation in industries, but the new rapid shutdown requirements facing the solar industry are having the opposite effect. Thanks to a coalition of manufacturers and interested parties across solar, the solutions being developed to meet NEC 2017 Module Level<a href=\"http:\/\/solarbuildermag.com\/bos\/nec-2017-module-level-solar-system-shutdown\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13610,12495,4737,13215,12491,14788,14624,14515],"class_list":["post-366178","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-abb","tag-bos","tag-featured","tag-fronius-usa","tag-inverters","tag-january-february-2018-print-issue","tag-rapid-shutdown","tag-tigo"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/366178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=366178"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/366178\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=366178"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=366178"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=366178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}