{"id":367718,"date":"2018-02-13T14:00:30","date_gmt":"2018-02-13T14:00:30","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19402"},"modified":"2018-02-13T14:00:30","modified_gmt":"2018-02-13T14:00:30","slug":"the-longi-term-play-get-familiar-with-this-record-breaking-chinese-manufacturer","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/the-longi-term-play-get-familiar-with-this-record-breaking-chinese-manufacturer\/","title":{"rendered":"The LONGi-term play: Get familiar with this record-breaking Chinese manufacturer"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Even amid the tariff uncertainty, China-based LONGi Solar is ready to establish a bigger presence in the U.S. and intrigues us in the (ahem) long-term. Wholly owned by LONGi Group, there was speculation that in a punitive tariff scenario the company might consider establishing its own U.S. manufacturing line, but<a href=\"http:\/\/solarbuildermag.com\/pv-modules\/longi-solar-modules\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,14788,14802,5863],"class_list":["post-367718","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-january-february-2018-print-issue","tag-longi-solar","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/367718","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=367718"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/367718\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=367718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=367718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=367718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}