{"id":369685,"date":"2018-02-19T15:11:10","date_gmt":"2018-02-19T15:11:10","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19724"},"modified":"2018-02-19T15:11:10","modified_gmt":"2018-02-19T15:11:10","slug":"largest-shopping-mall-solar-install-in-california-possible-because-of-bifacial-pv-panels","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/largest-shopping-mall-solar-install-in-california-possible-because-of-bifacial-pv-panels\/","title":{"rendered":"Largest shopping mall solar install in California possible because of bifacial PV panels"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The largest commercial rooftop solar PV installation in Hanford, Calif., and the largest solar system to be installed, to date, on a shopping mall in the state, was completed via Blue Sky Utility, a California-based renewable energy developer, and Passco Companies, a national real estate investment firm. The 1.62-MW commercial<a href=\"http:\/\/solarbuildermag.com\/news\/largest-shopping-mall-solar-install-in-california-possible-because-of-bifacial-pv-panels\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14765,2906,9974,5863,13803],"class_list":["post-369685","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bifacial","tag-news","tag-projects","tag-pv-modules","tag-sunpreme"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/369685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=369685"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/369685\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=369685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=369685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=369685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}