{"id":370708,"date":"2018-02-22T19:16:20","date_gmt":"2018-02-22T19:16:20","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=19774"},"modified":"2018-02-22T19:16:20","modified_gmt":"2018-02-22T19:16:20","slug":"first-solar-awarded-200-mw-project-via-georgia-powers-renewable-energy-development-initiative","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/first-solar-awarded-200-mw-project-via-georgia-powers-renewable-energy-development-initiative\/","title":{"rendered":"First Solar awarded 200-MW project via Georgia Power\u2019s Renewable Energy Development Initiative"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>First Solar is set to proceed with the development and construction of a 200-MWac solar power plant in Twiggs County, Ga. First Solar was awarded the installation as part of a 525 MWac RFP for Georgia Power&rsquo;s Renewable Energy Development Initiative (REDI). &ldquo;This is a tremendously exciting opportunity for First<a href=\"http:\/\/solarbuildermag.com\/news\/first-solar-awarded-200-mw-solar-project-via-georgia-powers-renewable-energy-development-initiative\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2189,2906,9974],"class_list":["post-370708","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-first-solar","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/370708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=370708"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/370708\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=370708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=370708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=370708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}