{"id":372432,"date":"2018-02-27T20:00:36","date_gmt":"2018-02-27T20:00:36","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=19830"},"modified":"2018-02-27T20:00:36","modified_gmt":"2018-02-27T20:00:36","slug":"lightsource-bp-to-build-largest-solar-farm-in-kansas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/lightsource-bp-to-build-largest-solar-farm-in-kansas\/","title":{"rendered":"Lightsource BP to build largest solar farm in Kansas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Lightsource BP has signed a 25-year power purchase and asset acquisition agreement with Mid-Kansas Electric Company (Mid-Kansas) Inc. An affiliate of Sunflower Electric Power Corp., Mid-Kansas is a cooperatively operated wholesale generation and transmission utility serving members across the state of Kansas. Located in Stanton County, Kan., the 20-megawatt project<a href=\"https:\/\/solarbuildermag.com\/news\/lightsource-bp-to-build-largest-solar-farm-in-kansas\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1590,14823,2906,9974],"class_list":["post-372432","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-financing","tag-lightsource-bp","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/372432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=372432"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/372432\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=372432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=372432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=372432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}