{"id":375363,"date":"2018-03-08T14:21:29","date_gmt":"2018-03-08T14:21:29","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=19973"},"modified":"2018-03-08T14:21:29","modified_gmt":"2018-03-08T14:21:29","slug":"origis-energys-52-mw-solar-project-in-mississippi-officially-up-and-running","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/origis-energys-52-mw-solar-project-in-mississippi-officially-up-and-running\/","title":{"rendered":"Origis Energy\u2019s 52-MW solar project in Mississippi officially up and running"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Cooperative Energy and Origis Energy officially unveiled their joint venture 52-MW solar project in Lamar County, Miss., with elected officials and business leaders joining the two companies at a ribbon cutting. The facility began operation in December. The 540-acre site, MS Solar 3, includes 206,000 polycrystalline solar panels which gather<a href=\"https:\/\/solarbuildermag.com\/news\/origis-energys-52-mw-solar-project-in-mississippi-officially-up-and-running\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13996,9974,14140],"class_list":["post-375363","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-origis-energy","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/375363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=375363"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/375363\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=375363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=375363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=375363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}