{"id":381415,"date":"2018-03-27T20:21:03","date_gmt":"2018-03-27T20:21:03","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20161"},"modified":"2018-03-27T20:21:03","modified_gmt":"2018-03-27T20:21:03","slug":"cypress-creek-lockheed-martin-get-12-solar-plus-storage-sites-up-and-running-12-mwh-total","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/cypress-creek-lockheed-martin-get-12-solar-plus-storage-sites-up-and-running-12-mwh-total\/","title":{"rendered":"Cypress Creek, Lockheed Martin get 12 solar-plus-storage sites up and running (12 MWh total)"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Lockheed Martin and Cypress Creek Renewables have commissioned 12 MWh of GridStar Lithium energy storage systems for 12 solar-plus-storage projects. The solar-plus-storage system will provide clean electricity to communities served by Brunswick Electric Membership Corporation (EMC) in southeastern North Carolina. Lockheed Martin&rsquo;s GridStar technology ensures that this power is rapidly<a href=\"https:\/\/solarbuildermag.com\/news\/cypress-creek-lockheed-martin-get-12-solar-plus-storage-sites-up-and-running\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13835,442,2796,2906,9974],"class_list":["post-381415","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cypress-creek-renewables","tag-energy-storage","tag-lockheed-martin","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/381415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=381415"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/381415\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=381415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=381415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=381415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}