{"id":384587,"date":"2018-04-05T14:58:56","date_gmt":"2018-04-05T14:58:56","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=19888"},"modified":"2018-04-05T14:58:56","modified_gmt":"2018-04-05T14:58:56","slug":"products-to-watch-9-customer-service-proposal-tools-for-the-solar-installer","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/products-to-watch-9-customer-service-proposal-tools-for-the-solar-installer\/","title":{"rendered":"Products to watch: 9 customer service, proposal tools for the solar installer"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The main components of a solar system, at this point, have been figured out. Module efficiency is higher than ever, inverters are more reliable and it&rsquo;s tough to imagine more cost-effective and complete racking systems. So, what&rsquo;s next? Storage? Sure, that&rsquo;s coming at some point. Solar + storage + EV<a href=\"https:\/\/solarbuildermag.com\/products\/9-cool-customer-service-proposal-tools-for-the-solar-installer\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14836,14276,14756,14867,14868,4737,14738,14700,3000,14869,13095,13867,13445],"class_list":["post-384587","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-2018-march-april-print-issue","tag-aurora-solar","tag-continental-control-systems","tag-cuttercroix","tag-egauge","tag-featured","tag-modsolar","tag-paystand","tag-products","tag-pvsketch","tag-residential-solar","tag-solar-log","tag-tigo-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/384587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=384587"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/384587\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=384587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=384587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=384587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}