{"id":386740,"date":"2018-04-12T12:36:21","date_gmt":"2018-04-12T12:36:21","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20313"},"modified":"2018-04-12T12:36:21","modified_gmt":"2018-04-12T12:36:21","slug":"caterpillar-dealer-commissions-500-kw-solar-demonstration-project-for-illinois-municipal-electric-agency","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/caterpillar-dealer-commissions-500-kw-solar-demonstration-project-for-illinois-municipal-electric-agency\/","title":{"rendered":"Caterpillar dealer commissions 500-kW solar demonstration project for Illinois Municipal Electric Agency"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Caterpillar dealer Altorfer has commissioned a 500-kW solar PV utility-scale demonstration project in St. Charles, Ill., as part of a 20-year power purchase agreement with the Illinois Municipal Electric Agency (IMEA). Featuring more than 4,800 Cat solar panels, the 2.3-acre facility is located in the Legacy Business Center adjacent to<a href=\"https:\/\/solarbuildermag.com\/news\/caterpillar-dealer-commissions-500-kw-solar-demonstration-project-for-illinois-municipal-electric-agency\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14875,2906,9974],"class_list":["post-386740","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-caterpilar","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/386740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=386740"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/386740\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=386740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=386740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=386740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}