{"id":389229,"date":"2018-04-19T12:24:11","date_gmt":"2018-04-19T12:24:11","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20348"},"modified":"2018-04-19T12:24:11","modified_gmt":"2018-04-19T12:24:11","slug":"hawaiian-electric-company-u-s-navy-break-ground-on-solar-farm-in-oahu","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/hawaiian-electric-company-u-s-navy-break-ground-on-solar-farm-in-oahu\/","title":{"rendered":"Hawaiian Electric Company, U.S. Navy break ground on solar farm in O\u2019ahu"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>REC Solar and Hawaiian Electric Co. broke ground on a 20-megawatt (MW), fixed-tilt solar facility, located at the U.S. Navy&rsquo;s Joint Base Pearl Harbor-Hickam West Loch Annex. Once completed, the West Loch solar farm will produce the lowest-cost renewable energy in the state at less than 8 cents per kilowatt-hour.<a href=\"https:\/\/solarbuildermag.com\/projects\/hawaiian-electric-company-u-s-navy-break-ground-solar-farm-oahu\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,13263],"class_list":["post-389229","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-rec-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/389229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=389229"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/389229\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=389229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=389229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=389229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}