{"id":39713,"date":"2014-09-16T14:47:30","date_gmt":"2014-09-16T14:47:30","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8079"},"modified":"2014-09-16T14:47:30","modified_gmt":"2014-09-16T14:47:30","slug":"california-dairy-installs-array-technologies-solar-tracking-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/california-dairy-installs-array-technologies-solar-tracking-system\/","title":{"rendered":"California Dairy Installs Array Technologies Solar Tracking System"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Vander Woude Dairy of Merced, California, was looking for a way to decrease operational expenses while providing its business with a sustainable form of power generation. Array Technologies Inc.&rsquo;s (ATI) customer, local design-build construction firm Pickett Solar, developed a 1.1-MWdc solar tracking array that will produce 100% of the dairy&rsquo;s<a href=\"http:\/\/solarbuildermag.com\/news\/california-dairy-installs-array-technologies-solar-tracking-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497,12500],"class_list":["post-39713","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project","tag-tracking"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/39713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=39713"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/39713\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=39713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=39713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=39713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}