{"id":397880,"date":"2018-05-15T17:03:39","date_gmt":"2018-05-15T17:03:39","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20659"},"modified":"2018-05-15T17:03:39","modified_gmt":"2018-05-15T17:03:39","slug":"nextracker-first-solar-team-on-600-mw-of-series-6-projects-to-feature-new-error-proof-panel-clamp","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nextracker-first-solar-team-on-600-mw-of-series-6-projects-to-feature-new-error-proof-panel-clamp\/","title":{"rendered":"NEXTracker, First Solar team on 600 MW of Series 6 projects, to feature new \u2018error-proof\u2019 panel clamp"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NEXTracker will begin collaborating with First Solar to provide its racking technology for the upcoming Series 6 panel rollout this year. The First Solar engineering procurement construction (EPC) group also selected NEXTracker&rsquo;s NX Horizon for multiple utility-scale projects in the southwestern United States, totaling 634 MW using the Series 6<a href=\"https:\/\/solarbuildermag.com\/news\/nextracker-joins-first-solar-ecosystem-to-feature-new-error-proof-panel-clamp\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12637,2906,13010,3000,13050],"class_list":["post-397880","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mounting-guide","tag-news","tag-nextracker","tag-products","tag-solar-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/397880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=397880"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/397880\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=397880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=397880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=397880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}