{"id":400455,"date":"2018-05-23T13:12:31","date_gmt":"2018-05-23T13:12:31","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20610"},"modified":"2018-05-23T13:12:31","modified_gmt":"2018-05-23T13:12:31","slug":"aw-snap-we-look-at-the-solar-raceway-wire-management-solution","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/aw-snap-we-look-at-the-solar-raceway-wire-management-solution\/","title":{"rendered":"Aw Snap: We look at the Solar Raceway wire management solution"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Fresh eyes are valuable every now and then. That was the position New York Manufacturing found itself in when it was approached by a large building products company to assist with its wire management needs. Their solar installations were continually plagued by one common theme: wire management. Like many other<a href=\"https:\/\/solarbuildermag.com\/bos\/solar-raceway-wire-management-solution\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14890,12495,4737,3000,14897,13601],"class_list":["post-400455","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-2018-may-june-print-issue","tag-bos","tag-featured","tag-products","tag-solar-raceway","tag-wire-management"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/400455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=400455"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/400455\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=400455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=400455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=400455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}