{"id":40388,"date":"2014-09-18T16:08:02","date_gmt":"2014-09-18T16:08:02","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8093"},"modified":"2014-09-18T16:08:02","modified_gmt":"2014-09-18T16:08:02","slug":"socore-energy-installs-315-kw-solar-system-at-new-york-movie-theater","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/socore-energy-installs-315-kw-solar-system-at-new-york-movie-theater\/","title":{"rendered":"SoCore Energy Installs 315-kW Solar System at New York Movie Theater"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SoCore Energy a wholly-owned indirect subsidiary of Edison International,&nbsp;and Cinemark Holdings Inc.&nbsp;have lit up the big screen with solar power at the Cinemark Tinseltown theatre in Rochester, N.Y. As part of a larger national rollout of Cinemark&rsquo;s solar installations by SoCore Energy, this theatre has connected 315 kW of solar<a href=\"http:\/\/solarbuildermag.com\/news\/socore-energy-installs-315-kw-solar-system-new-york-movie-theater\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9726,12497,4491],"class_list":["post-40388","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-northeast","tag-project","tag-roof"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/40388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=40388"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/40388\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=40388"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=40388"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=40388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}