{"id":404864,"date":"2018-06-04T16:13:21","date_gmt":"2018-06-04T16:13:21","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20805"},"modified":"2018-06-04T16:13:21","modified_gmt":"2018-06-04T16:13:21","slug":"largest-solar-project-on-tribal-land-being-developed-by-nv-energy-8minutenergy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/largest-solar-project-on-tribal-land-being-developed-by-nv-energy-8minutenergy\/","title":{"rendered":"Largest solar project on tribal land being developed by NV Energy, 8minutenergy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NV Energy is developing a 300 MW (420 MW-dc) solar facility on the Moapa River Indian Reservation about 30 miles north of Las Vegas, which will be the largest solar installation to date built on tribal land. It will also be the largest solar PV project ever built for NV<a href=\"https:\/\/solarbuildermag.com\/news\/largest-solar-project-on-tribal-land-being-developed-by-nv-energy-8minutenergy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14184,2906,11392,9974],"class_list":["post-404864","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-8minutenergy-renewables","tag-news","tag-nv-energy","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/404864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=404864"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/404864\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=404864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=404864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=404864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}