{"id":40562,"date":"2014-09-19T06:00:43","date_gmt":"2014-09-19T06:00:43","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8096"},"modified":"2014-09-19T06:00:43","modified_gmt":"2014-09-19T06:00:43","slug":"sunedison-completes-1-8-mw-solar-system-on-massachusetts-superfund-site-2","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunedison-completes-1-8-mw-solar-system-on-massachusetts-superfund-site-2\/","title":{"rendered":"SunEdison Completes 1.8-MW Solar System on Massachusetts Superfund Site"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunEdison Inc. in partnership with BlueWave Capital LLC of Boston today announced the completion of a 1.8-MWdc solar power plant&nbsp; constructed on a remediated EPA Superfund site in New Bedford, Massachusetts. The system was developed on approximately 10 acres of land on the remediated Sullivan&rsquo;s Ledge landfill site and represents<a href=\"http:\/\/solarbuildermag.com\/news\/sunedison-completes-1-8-mw-solar-system-massachusetts-superfund-site\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12494,2906,9726,12497],"class_list":["post-40562","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ground","tag-news","tag-northeast","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/40562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=40562"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/40562\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=40562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=40562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=40562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}