{"id":406010,"date":"2018-06-08T11:00:26","date_gmt":"2018-06-08T11:00:26","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20770"},"modified":"2018-06-08T11:00:26","modified_gmt":"2018-06-08T11:00:26","slug":"how-to-maximize-large-scale-pv-site-value-with-string-design","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/how-to-maximize-large-scale-pv-site-value-with-string-design\/","title":{"rendered":"How to maximize large-scale PV site value with string design"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Service models and technology at the string inverter level is vastly improved from where it was a few years ago. Earlier this week we looked at the value of choosing string inverters over central inverters for projects upward of 20 MW, thanks to 1,500-volt architecture, and then the nuances of<a href=\"https:\/\/solarbuildermag.com\/solar-tariff\/how-to-maximize-large-scale-pv-site-value-with-string-design\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14907,14380,12491,2906,14273],"class_list":["post-406010","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-30-day-campaign-to-attack-the-solar-tariff","tag-cps-america","tag-inverters","tag-news","tag-string-inverters"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/406010","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=406010"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/406010\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=406010"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=406010"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=406010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}