{"id":407098,"date":"2018-06-11T12:14:24","date_gmt":"2018-06-11T12:14:24","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=20873"},"modified":"2018-06-11T12:14:24","modified_gmt":"2018-06-11T12:14:24","slug":"floridas-3d-solar-installs-first-quick-mount-qrail-racking-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/floridas-3d-solar-installs-first-quick-mount-qrail-racking-system\/","title":{"rendered":"Florida\u2019s 3D Solar installs first Quick Mount QRail Racking System"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>3D Solar, a Florida-based solar contractor, and Quick Mount PV, a manufacturer of waterproof mounting and racking systems, announced today that 3D Solar has installed the nation&rsquo;s first Quick Mount PV QRail Racking System. QRail is an innovative new rooftop racking system, with patented QClick and QSplice technologies that simplify<a href=\"https:\/\/solarbuildermag.com\/news\/floridas-3d-solar-installs-first-quick-mount-qrail-racking-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14911,12637,2906,3000,13338,13095],"class_list":["post-407098","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-3d-solar","tag-mounting-guide","tag-news","tag-products","tag-quick-mount-pv","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/407098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=407098"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/407098\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=407098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=407098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=407098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}