{"id":409546,"date":"2018-06-18T16:31:37","date_gmt":"2018-06-18T16:31:37","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21047"},"modified":"2018-06-18T16:31:37","modified_gmt":"2018-06-18T16:31:37","slug":"largest-rooftop-solar-project-in-the-midwest-secured-by-ecofoot2-ballast-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/largest-rooftop-solar-project-in-the-midwest-secured-by-ecofoot2-ballast-system\/","title":{"rendered":"Largest rooftop solar project in the Midwest secured by EcoFoot2+ ballast system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Continental Electrical Construction Co. (CECCo) chose Ecolibrium Solar&rsquo;s EcoFoot2+ Ballasted Racking System to secure a 3.5 MW solar array &ndash; has been successfully delivered to the job site at Magid Glove and Safety Manufacturing Company in Romeoville, Ill. When completed in November 2018, the array will be the largest<a href=\"https:\/\/solarbuildermag.com\/news\/largest-rooftop-solar-project-in-the-midwest-secured-by-ecofoot2-ballast-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14266,2906,9974],"class_list":["post-409546","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ecolibrium","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/409546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=409546"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/409546\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=409546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=409546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=409546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}