{"id":416079,"date":"2018-07-08T14:31:59","date_gmt":"2018-07-08T14:31:59","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21226"},"modified":"2018-07-08T14:31:59","modified_gmt":"2018-07-08T14:31:59","slug":"pre-assembled-mounting-structures-speed-site-installation-by-35-percent","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/pre-assembled-mounting-structures-speed-site-installation-by-35-percent\/","title":{"rendered":"Pre-assembled mounting structures speed site installation by 35 percent"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Delivery is everything in solar development. Delivery on-time or even ahead of schedule signals reliability to investors and paves the way for more builds, especially those needed at an accelerated pace due to impending, seasonal weather conditions or site takeovers when the original racking partner could not deliver the job.<a href=\"https:\/\/solarbuildermag.com\/news\/pre-assembled-mounting-structures-speed-site-installation-by-35-percent\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14907,12637,2906,14465],"class_list":["post-416079","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-30-day-campaign-to-attack-the-solar-tariff","tag-mounting-guide","tag-news","tag-omco-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/416079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=416079"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/416079\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=416079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=416079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=416079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}