{"id":417454,"date":"2018-07-12T16:48:15","date_gmt":"2018-07-12T16:48:15","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21253"},"modified":"2018-07-12T16:48:15","modified_gmt":"2018-07-12T16:48:15","slug":"yaskawa-solectria-tigo-team-up-on-rapid-shutdown-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/yaskawa-solectria-tigo-team-up-on-rapid-shutdown-system\/","title":{"rendered":"Yaskawa Solectria, Tigo team up on rapid shutdown system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Yaskawa Solectria Solar (YSS) announced its partnership with Tigo, the leading manufacturer of Module-Level Power Electronics (MLPE). Together YSS and Tigo are providing a simple, safe solution for roof-mounted PV systems to ensure the safety of firefighters and first responders, and guarantee system owners of full compliance with the National<a href=\"https:\/\/solarbuildermag.com\/news\/yaskawa-solectria-tigo-team-up-on-rapid-shutdown-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,2906,3000,13445,13842],"class_list":["post-417454","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-news","tag-products","tag-tigo-energy","tag-yaskawa-solectria"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/417454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=417454"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/417454\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=417454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=417454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=417454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}