{"id":418877,"date":"2018-07-16T11:00:46","date_gmt":"2018-07-16T11:00:46","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21198"},"modified":"2018-07-16T11:00:46","modified_gmt":"2018-07-16T11:00:46","slug":"accelerate-the-solar-sales-cycle-with-automated-utility-data","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/accelerate-the-solar-sales-cycle-with-automated-utility-data\/","title":{"rendered":"Accelerate the solar sales cycle with automated utility data"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Trump administration&rsquo;s 30 percent tariff on imported solar panels represents a significant obstacle for the U.S. solar market. SEIA predicts that the tariffs could reduce this year&rsquo;s domestic solar growth by 18 percent, and could lead to the loss of 23,000 jobs. But one game-changing innovation could give solar<a href=\"https:\/\/solarbuildermag.com\/solar-tariff\/accelerate-the-solar-sales-cycle-with-automated-utility-data\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14907,2906,14936,14887],"class_list":["post-418877","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-30-day-campaign-to-attack-the-solar-tariff","tag-news","tag-urjanet","tag-utility-data"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/418877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=418877"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/418877\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=418877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=418877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=418877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}