{"id":419020,"date":"2018-07-16T20:10:25","date_gmt":"2018-07-16T20:10:25","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21282"},"modified":"2018-07-16T20:10:25","modified_gmt":"2018-07-16T20:10:25","slug":"solar-canopy-installed-in-just-five-days-ready-for-upcoming-sturgis-motorcycle-rally","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-canopy-installed-in-just-five-days-ready-for-upcoming-sturgis-motorcycle-rally\/","title":{"rendered":"Solar canopy installed in just five days, ready for upcoming Sturgis Motorcycle Rally"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Interconnection Systems, Inc. (ISI), in partnership with Quest Renewables, completed the installation of a 54.6-kW QuadPod solar canopy system at the Harley-Davidson Rally Point Plaza in Sturgis SD in just five days in June. The plaza is used as a central gathering place during the Sturgis Motorcycle Rally and for<a href=\"https:\/\/solarbuildermag.com\/news\/solar-canopy-installed-in-just-five-days-ready-for-upcoming-sturgis-motorcycle-rally\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14938,13644,12637,2906,9974,14518],"class_list":["post-419020","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-canopys","tag-carports","tag-mounting-guide","tag-news","tag-projects","tag-quest-renewables"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/419020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=419020"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/419020\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=419020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=419020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=419020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}