{"id":42055,"date":"2014-09-23T16:09:49","date_gmt":"2014-09-23T16:09:49","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8121"},"modified":"2014-09-23T16:09:49","modified_gmt":"2014-09-23T16:09:49","slug":"rec-solar-panels-power-3-18-mw-rockville-solar-ii-project-in-indianapolis","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rec-solar-panels-power-3-18-mw-rockville-solar-ii-project-in-indianapolis\/","title":{"rendered":"REC Solar Panels Power 3.18-MW Rockville Solar II Project in Indianapolis"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>REC Group, a leading global provider of solar energy solutions, announced today that its photovoltaic (PV) panels power the largest commercial rooftop solar system in the midwestern United States. The recently commissioned 3.18-MW Rockville Solar II project in Indianapolis features 12,264 260-watt REC Peak Energy Series PV panels. The system<a href=\"http:\/\/solarbuildermag.com\/news\/rec-solar-panels-power-3-18-mw-rockville-solar-ii-project-indianapolis\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9679,12487,2906,12497],"class_list":["post-42055","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-midwest","tag-modules","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/42055","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=42055"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/42055\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=42055"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=42055"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=42055"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}