{"id":42379,"date":"2014-09-24T14:34:21","date_gmt":"2014-09-24T14:34:21","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8125"},"modified":"2014-09-24T14:34:21","modified_gmt":"2014-09-24T14:34:21","slug":"california-solar-project-is-first-for-new-net-energy-metering-program","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/california-solar-project-is-first-for-new-net-energy-metering-program\/","title":{"rendered":"California Solar Project is First for New Net Energy Metering Program"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A new solar project in Silver Lakes, a planned community of more than 3,000 residences in San Bernardino County, Calif., will be the first to take advantage of Southern California Edison&rsquo;s new NEMA program. A revolutionary step forward for distributed solar generation, this program allows a utility customer, such as<a href=\"http:\/\/solarbuildermag.com\/news\/california-solar-project-first-new-net-energy-metering-program\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12487,12496,2906,9667,12497,12500],"class_list":["post-42379","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-modules","tag-mounting","tag-news","tag-pacific","tag-project","tag-tracking"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/42379","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=42379"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/42379\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=42379"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=42379"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=42379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}