{"id":42720,"date":"2014-09-25T13:17:01","date_gmt":"2014-09-25T13:17:01","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8132"},"modified":"2014-09-25T13:17:01","modified_gmt":"2014-09-25T13:17:01","slug":"sol-systems-finances-944-kw-california-church-solar-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sol-systems-finances-944-kw-california-church-solar-project\/","title":{"rendered":"Sol Systems Finances 944-kW California Church Solar Project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Sol Systems announced today that it successfully financed a 944-kW solar project in partnership with its investor client Washington Gas Energy Systems (WGES), a subsidiary of WGL. The operational solar energy system is located at Valley Baptist Church in Bakersfield, Calif., and A-C Electric served as the engineering, procurement and<a href=\"http:\/\/solarbuildermag.com\/news\/sol-systems-finances-944-kw-california-church-solar-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497],"class_list":["post-42720","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/42720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=42720"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/42720\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=42720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=42720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=42720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}