{"id":427597,"date":"2018-08-09T14:42:16","date_gmt":"2018-08-09T14:42:16","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21481"},"modified":"2018-08-09T14:42:16","modified_gmt":"2018-08-09T14:42:16","slug":"ensync-energy-sells-ppa-for-california-fire-training-facility-solar-install-to-standard-solar","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ensync-energy-sells-ppa-for-california-fire-training-facility-solar-install-to-standard-solar\/","title":{"rendered":"EnSync Energy sells PPA for California fire training facility solar install to Standard Solar"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>EnSync Energy Systems sold a project under a 20-year power purchase agreement (PPA) with the California Department of Forestry and Fire Protection (CAL FIRE) to Standard Solar &mdash; a deal that marks EnSync Energy&rsquo;s entry into the California marketplace. EnSync Energy is building a 600-kilowatt solar installation at the CAL<a href=\"https:\/\/solarbuildermag.com\/news\/ensync-energy-sells-ppa-for-california-fire-training-facility-solar-install-to-standard-solar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,14228,1590,2906,3103],"class_list":["post-427597","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-ensync","tag-financing","tag-news","tag-standard-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/427597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=427597"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/427597\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=427597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=427597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=427597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}