{"id":436226,"date":"2018-09-04T19:36:11","date_gmt":"2018-09-04T19:36:11","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21735"},"modified":"2018-09-04T19:36:11","modified_gmt":"2018-09-04T19:36:11","slug":"conti-solar-named-epc-for-large-rhode-island-solar-project-portfolio","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/conti-solar-named-epc-for-large-rhode-island-solar-project-portfolio\/","title":{"rendered":"Conti Solar named EPC for large Rhode Island solar project portfolio"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Conti Solar, a national solar EPC, O&amp;M and energy storage company was selected to provide full turnkey EPC services for Southern Sky Renewable Energy&rsquo;s 35 MW solar project portfolio. Headquartered in Warwick, Rhode Island, Southern Sky is the region&rsquo;s leading renewable energy developer. The five projects in the portfolio include<a href=\"https:\/\/solarbuildermag.com\/news\/conti-solar-named-epc-for-large-rhode-island-solar-project-portfolio\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14894,2906,14972],"class_list":["post-436226","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-conti-solar","tag-news","tag-southern-sky-renewable"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/436226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=436226"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/436226\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=436226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=436226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=436226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}