{"id":439343,"date":"2018-09-13T18:13:14","date_gmt":"2018-09-13T18:13:14","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21852"},"modified":"2018-09-13T18:13:14","modified_gmt":"2018-09-13T18:13:14","slug":"arizona-regulators-reject-new-solar-fixed-charges-requested-by-two-utilities-but-ends-net-metering","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/arizona-regulators-reject-new-solar-fixed-charges-requested-by-two-utilities-but-ends-net-metering\/","title":{"rendered":"Arizona regulators reject new solar fixed charges requested by two utilities (but ends net metering)"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Out in Arizona, home of the demand charge, the Arizona Corporation Commission rejected a request by two utilities to subject new solar customers to large monthly fixed charges. As part of their recent rate cases, Tucson Electric Power Company (TEP) and UNS Electric sought a monthly Grid Access Charge and<a href=\"https:\/\/solarbuildermag.com\/news\/arizona-regulators-reject-new-solar-fixed-charges-requested-by-two-utilities\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14889,2397,2906,10461],"class_list":["post-439343","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-demand-charges","tag-net-metering","tag-news","tag-regulations"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/439343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=439343"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/439343\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=439343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=439343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=439343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}