{"id":441012,"date":"2018-09-18T19:25:51","date_gmt":"2018-09-18T19:25:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21888"},"modified":"2018-09-18T19:25:51","modified_gmt":"2018-09-18T19:25:51","slug":"carlisle-roof-foam-and-coatings-present-ci-roof-restoration-options-at-spi","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/carlisle-roof-foam-and-coatings-present-ci-roof-restoration-options-at-spi\/","title":{"rendered":"Carlisle Roof Foam and Coatings present C&amp;I roof restoration options at SPI"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Just as a mechanic wouldn&rsquo;t put a new Ferrari 456 V-8 engine in an old Geo Metro, a deteriorating old roof is not the best option to hold a new solar array on an existing building. Carlisle Roof Foam and Coatings will be showcasing its roofing options, for new and<a href=\"https:\/\/solarbuildermag.com\/news\/carlisle-roof-foam-and-coatings-present-ci-roof-restoration-options-at-spi\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14980,13203,12637,2906,3000,3103],"class_list":["post-441012","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carlisle-roof-foam-and-coatings","tag-commercial","tag-mounting-guide","tag-news","tag-products","tag-standard-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/441012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=441012"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/441012\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=441012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=441012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=441012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}