{"id":441318,"date":"2018-09-19T13:51:20","date_gmt":"2018-09-19T13:51:20","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21894"},"modified":"2018-09-19T13:51:20","modified_gmt":"2018-09-19T13:51:20","slug":"sunpower-cells-modules-to-be-excluded-from-the-trump-tariffs","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunpower-cells-modules-to-be-excluded-from-the-trump-tariffs\/","title":{"rendered":"SunPower cells, modules to be excluded from the Trump tariffs"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Office of the U.S. Trade Representative filed a decision to exclude certain interdigitated back contact (IBC) solar cells and modules within specific size and power ranges from the Trump solar tariffs imposed in January, which includes SunPower&rsquo;s IBC cells and modules.&nbsp;SunPower Chairman and CEO Tom Werner had this to<a href=\"https:\/\/solarbuildermag.com\/news\/sunpower-cells-modules-to-be-excluded-from-the-trump-tariffs\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,5863,954],"class_list":["post-441318","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pv-modules","tag-sunpower"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/441318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=441318"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/441318\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=441318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=441318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=441318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}