{"id":442088,"date":"2018-09-21T15:14:37","date_gmt":"2018-09-21T15:14:37","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21959"},"modified":"2018-09-21T15:14:37","modified_gmt":"2018-09-21T15:14:37","slug":"streamlined-residential-solar-solaria-enphase-energy-quick-mount-pv-join-forces","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/streamlined-residential-solar-solaria-enphase-energy-quick-mount-pv-join-forces\/","title":{"rendered":"Streamlined residential solar: Solaria, Enphase Energy, Quick Mount PV join forces"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solaria Corporation, a global provider of high efficiency solar modules, is teaming with mounting and racking provider Quick Mount and microinverter manufacturer Enphase Energy, to produce a single, unified system that ensures efficiency, performance and aesthetics. Available through select distributors, the complete solution gives solar installers the ability to streamline<a href=\"https:\/\/solarbuildermag.com\/news\/streamlined-residential-solar-solaria-enphase-energy-quick-mount-pv-join-forces\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12898,12491,2906,5863,13338,13656],"class_list":["post-442088","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-enphase-energy","tag-inverters","tag-news","tag-pv-modules","tag-quick-mount-pv","tag-solaria"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/442088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=442088"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/442088\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=442088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=442088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=442088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}