{"id":445781,"date":"2018-10-01T14:07:03","date_gmt":"2018-10-01T14:07:03","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=21991"},"modified":"2018-10-01T14:07:03","modified_gmt":"2018-10-01T14:07:03","slug":"fronius-launches-inverter-with-integrated-sunspec-rapid-shutdown-transmitter","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/fronius-launches-inverter-with-integrated-sunspec-rapid-shutdown-transmitter\/","title":{"rendered":"Fronius launches inverter with integrated SunSpec rapid shutdown transmitter"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>String inverter manufacturer Fronius launches the new Fronius Symo Advanced, a three-phase string inverter with an integrated Power Line Communication (PLC) transmitter based on the SunSpec Rapid Shutdown communication standard. In conjunction with the Tigo TS4-F cover, solar installers get a simple and cost-effective solution for Module Level Shutdown. Jurisdictions<a href=\"https:\/\/solarbuildermag.com\/news\/fronius-launches-inverter-with-integrated-sunspec-rapid-shutdown-transmitter\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13529,12491,2906,3000,14624],"class_list":["post-445781","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-fronius","tag-inverters","tag-news","tag-products","tag-rapid-shutdown"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/445781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=445781"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/445781\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=445781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=445781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=445781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}